Reactive power penalties start with the lack of a capacitor bank register.

Where is the compensator installed, how much did it cost, and when does its warranty expire?Build a central register of installations, a map of capacitor banks, and manage compensation at the facility level based on real penalties for $\tan \phi$ and $Q_{cap}$, rather than an ideal $\cos \phi$ on paper.

01. Global register of installations

The module creates a central network dashboard featuring an interactive map of compensators (separate from the store map).

In one place, you see which facilities physically have devices installed and which locations are unprotected and exposed to DSO penalties.

02. Protection against penalties ($\tan \phi$ and $Q_{cap}$)

The software utilizes cloud signals (from the system core) to trigger precise alerts for exceedances of inductive reactive energy ($\tan \phi$) and capacitive reactive energy ($Q_{cap}$).